• 0 Posts
  • 14 Comments
Joined 11 days ago
cake
Cake day: August 30th, 2025

help-circle





  • My keyboard these days is much much stronger than the keyboard I had in the 90s. In the 80s the back was full metal and some had the case be metal as well. Then in the 90s it went all plastic and super fragile. For the past 15 years or so I’ve had a keyboard with a thick metal frame. I’ve smashed it lots of times and it doesn’t care at all. If you’d pick it up and smash the monitor with it, it would totally destroy the monitor. My desk is a metal frame with solid wood, but the average IKEA desk probably wouldn’t stand a chance.


  • Tell me Legolas, what do your elven eyes see?

    Fucking pixels Aragorn, it makes me want to puke. And what the fuck is up with these compression artifacts? What tier of Netflix do you have?

    Sorry Legolas, could we just enjoy the movie?

    Maybe if the dwarf stops stinking up the place. And don’t think I didn’t see him take that last chicken wing, fucking dwarves.


  • Sure you can physically move the gate. The intergalactic gate bridge proves that in spades. But there’s more to it than just the gate. It’s also all the supporting hardware. Without a DHD you need so much hardware to make it work. Then there’s all the security issues. Being inside a mountain is a huge plus when it comes to safety. Not just from a foothold situation, but also when being connected to a black hole for example. And having a failsafe device is also something easier done inside a mountain. You can destroy the entire base without basically setting off a nuke without warning in the mainland US. Possibly even destroy the base without anybody on the outside knowing about it, or with the option to say it’s an accidental collapse. Then there’s moving all the personnel, who are all stationed at that base. With other programs like NORAD being stationed there, it’s easy to hide what you are doing. This is much harder on other sites, especially to cover up the huge energy hookup needed to establish the wormhole before it can draw power from the other side.

    Bottom line it would cost probably a billion dollars or even more. That’s if a good enough site already exists, otherwise it would cost way more. And in the end be worse off in every possible way. Yeah no, you are right, that sounds exactly like a Trump move.




  • Looked up the invoice for you (rounded the numbers for simplicity):

    Panels (8x) including micro inverters, all of the mounting hardware, cables etc. - $2500 Hardware for upgrading the electrical panel - $400 Labour, various items, delivery costs - $600

    IIRC it was 3 dudes for about half a day. Two dudes for the panels and an electrician that checked what the panel dudes did on the roof and upgraded my electrical panel.

    I felt like it was a pretty good deal. Panels could have been cheaper, but I wanted the full black ones. And a single inverter would have been cheaper than micro inverters, but the panels are partly shaded a lot of the time due to a tree. Calculations I did showed the extra price of the micro inverters would be worth it to get the most out of the panels.