NASA has labelled the botched 2024 Starliner mission, which left two astronauts stranded in space for months, a “Type A” mishap, on par with fatal shuttle disasters of the past, in a newly published report.
The category is the space agency’s most severe, reserved for incidents causing more than $2m (£1.49 m) in damage, the loss of a vehicle or its control, or deaths.
On Thursday, Nasa’s new boss, Jared Isaacman, blasted Boeing, which built Starliner, and the space agency for poor decision-making and leadership that led to the failed mission.


I’m not sure you understand who makes spacecraft that NASA uses in the past or present. There are not “NASA [built]” spacecraft.
The difference between what you’re calling “private company spacecraft” and “NASA [built]” is just contract terms used on how to pay for it.
You’re also leaving out how (fuck Musk) SpaceX Dragon is also a private company spacecraft and has been wildly successful and saving billions of dollars of tax payer money over running the Space Shuttle in its place.
shuttle program simply moved to the military nowadays :/
I’m not NASA or BOEING, but I’m going to imagine that before, Nasa would be calling the shots, essentially designing the craft, and overseeing (as in breathing down their necks) what contractors built. Now NASA goes “I want a thingy that goes up” and the contractor makes the decisions, cuts the corners it wants, and creates mind boggling cost overruns.
Oh, BTW, NASA ( and NACA before) has historically been THE aeronautical reference research body in the west. Maybe they didn’t actually rivet the aluminum sheets, but they intimately knew what was going on.
You’re exactly right. This, in the industry, is called a “cost plus” contract. What this means is that NASA can ask for whatever they want no matter how outlandish and the aerospace contractor (such as Boeing in for Space Shuttle) will build it for them. NASA is bill for all of the actual costs of the design and construction PLUS a set percentage which is pure profit for the contractor. Aerospace contractors LOVE “cost plus”!
What frequently happens with big space projects like this is that design objectives change or material limitations are uncovered during construction over the years. NASA may start by saying “we want this to carry 10 Astronauts”. Contractor designs and starts building the main vehicle. Then during a unit test, they find the G forces produced on the angle of the seats is too high for safety, so the angle needs to be changed. All the money spent designing and building the old seats NASA still has to pay, and the contractor still gets their fixed Plus profit. The new design and construction of the safe seats are ALSO paid by NASA as well as a Plus profit for the new seats.
You’re exactly WRONG on this one.
Now what was used for private spaceflight companies (SpaceX cargo, Northrop cargo, SpaceX crew, Boeing Crew) is called “fixed price contracts”.
Ideally, NASA writes out the specs of the vehicle they want to exist. The aerospace contractor looks at the specs, determines how much money they would need to design, build, and profit from the exercise and gives NASA a fixed price. They compete with other contractors bidding on the same work. The Commercial Crew program had 3 bidding contractors, Boeing, SpaceX, and Sierra Space. NASA looks at the general designs, considers the contractors, and makes their choice. This is the end of how theory matches reality.
In reality, some of the same problems found during construction come up, or NASA changes their mind halfway through the construction. NASA originally wanted the crew vehicles to carry 6 Astronauts. However during landing tests, they found the G forces were higher than they liked on the humans. To lower the G forces, they had to lean the seats back at a less steep angle. However this means that they now can’t fit 6 seats in, but only 4. In a “cost plus” contract this would be business as usually, and the contractor would simply carry on charging NASA more money, but this is supposed to be Fixed Price. But the contractors didn’t sign up for 4 seats in the contract, and they’ve already done a lot of work they won’t be paid for, so contractors reasonably pushed back saying “no we’re not going to work for free. We built what you asked. Now you say you want something different. You want a change, pay us.”. NASA agree, and there were some additional payments made to the contractors.
So “Fixed Price” isn’t exactly fixed price when NASA changes the specs halfway through. Even with ALL of these challenges, Fixed price SpaceX and Northrop commercial cargo and SpaceX commercial crew have been HUGE cost savings over the old “cost plus” model.
If you want to see how much, check out the costs of the most recent “cost plus” human space vehicle Lockeheed Orion capsule. Your eyes will pop out of your heat.
All valid points, and yes SpaceX is a demonstration of how privatization can be more innovative. The challenge is that the counterpoint of Boeing culture change causing things like the Starliner is about as valid when regulatory capture happens.
I’m not saying nationalizing companies would help, but a government with good oversight (which is more and more of a question under Trump) could also help.
We’ll its not “regulatory capture” because we’re not talking about regulatory agencies, but you’re right if you’re talking corporate capture.
I know its going to sound counter-intuitive, but Starliner was actually necessary to break corporate capture.
The entrenched interests in Aerospace as well as Congress had almost no desire to change. Aerospace loved their “cost plus” infinite money printing machines paid for by government dollars. Contractors had zero concern for cost overruns/ballooning costs. Congress got to land Aerospace jobs in their districts. NASA got working but VERY EXPENSIVE space vehicles every 10-20 years. Fat cats on all sides were very very happy with this arrangement.
A very small set of politicians concerned about costs (and likely some campaign contributions) along with NASA wanted much cheaper vehicles then they were getting at that time. So they got a proposal to have private companies bid for fixed price contracts for space cargo flights. “UPS for space shipments” essentially. It worked. Law passed It was cheap. It was reliable.
So then with the success of private cargo, questions were raise why we were spending orders of magnitude more on human flights to the International Space Station? There was much clutching of pearls about these new hotshot private space companies and if they could handle human spaceflight. Somehow Boeing, the trusted legacy maker of the Space Shuttle and Apollo, was convinced to bid on human private spaceflight. There was now a company Congress would be confident would deliver a working solution, and they still got to tell their districts they were bringing
porkjobs. Those other untrustworthy “newspace” companies could fail, and Boeing would still deliver human spaceflight as they had for decades.We know now how wrong that was, but without that as a possible future, no human private spaceflight would have happened. If it had just been newspace companies like SpaceX and Sierra Space, Congress never would have passed the legislation to allow Commercial Crew to happen.
So you can see that Starliner needed to exist to break the corporate capture. That had to existed for use to break the corporate capture model that plagued human spaceflight.
I don’t have much faith in that idea. Look at what NASA was before private spaceflight. I love them for other reasons, but look at what ESA (European Space Agency) is today. Safran is a company that is the Boeing to ESA with all the same problems of Boeing for NASA.
Thank you for posting this. Even the Saturn V was built in part by Boeing.
The more important issue here is Boeing execs should be held accountable for destroying the company. If a big war pops off and we need Boeing to deliver something they probably fucking won’t be able to. It’s literally a national security issue and their board should be tried for treason.