Because running piping along the outside of a building is trending right now.

Originally, I wasn’t going to put any generators down on this floor, and just leave it for logistics and a control room, but… there’s WAY too much space to fill with just that. So, I’m framing out like 1/3 of the generators to go here.

Forgot to get a shot of the first floor before I started paving over it.

The remaining generators.

Not entirely sure where I’m going with the top floor, at this point, but I’m just kinda paving anyway.



A few shots of the pipework in progress. I haven’t actually even started routing to the machines with this yet, this is just me wanting to keep all the lines together, running by a main control/inspection area, and then running all the way around to the back of the building where they go up to a bank of Fluid Buffers, and then back down. I’m quite happy with how neat and tight it ended up.